NE555 timer relay module - delay 0.1-99.9 s, 250 V / 10 A
This goes with it
incl. VAT, plus shipping
Description
Product overview
- Electronic time relay for delayed or timed switching
- Operating voltage: 12 V DC
- Switching capacity up to 10 A at 250 V AC
- Adjustable delay times from 0.1 to 99.9 seconds
- Relay output for direct load control
- Compact size with DIN rail mounting
Product description
This time relay module generates an adjustable delay between the input signal and the switching action. After being supplied with 12 V DC, it waits for a trigger pulse at the input; the module then counts down the set time and activates its relay output. This lets you automate startup sequences or switch loads on and off with defined delays.
The relay output switches up to 10 A at 250 V AC directly, which is sufficient for many household appliances and low-power industrial loads. If you need to switch higher currents, use the relay to control a contactor or a higher-power switching relay. The delay time is configured using a potentiometer or display and ranges from 0.1 to 99.9 seconds. Shorter or longer delays are not possible with this module.
Example applications include switching on a pump after a pressure build-up delay, switching off a motor after a run-on delay, or timed control of lighting in stairwells. In automation projects, the module can also serve as a simple logic controller for subsequent steps when multiple modules are combined.
Operation requires a regulated 12 V DC power supply; a separate power supply is only unnecessary if the project already has one. The input requires a control signal of at least 2 V DC for reliable triggering. Work on or near power lines requires specialist expertise.
Safety notice
The module is not intended for direct use in household electrical circuits or for permanent installation. It is intended exclusively for prototyping, testing, and development. The relay output carries mains voltage; installation work must only be carried out by qualified electricians. If you are unsure about how to use it, consult a qualified electrician before commissioning.